What a good bid analysis answers
- Who is actually low once the scope is equal?
- Where do the bids disagree by a lot on the same item?
- What did each bidder exclude, assume or qualify?
- What would it cost to close the gaps in the lowest bids?
Step 1: Normalize the scope
Break the bid into the same line items for every bidder. If a sub submits a lump sum, ask for a breakdown or map their number to your scope list. You cannot analyze what you cannot compare.
Step 2: Look for outliers
When one bid is far below the others on a line, they may have misread the drawings, missed an item, or be buying the job. A bid far above the others may include scope the rest left out. Both need a phone call before you decide.
Step 3: Price the gaps
For every exclusion, add what it would cost to cover it so each bid reflects the same scope. Often the cheapest bid on paper falls to second or third place after this step.
Step 4: Record the decision
Note why you chose the awarded bid and what clarifications were agreed. That record settles disputes later about what was and was not included.
Frequently asked questions
What is the difference between bid analysis and bid leveling?
Leveling makes the scopes equal. Analysis is the broader review of price, outliers, qualifications and risk that you do on top of it.
How many bids should I collect per trade?
Three is a common target when the market allows it, enough to see outliers without making the comparison unmanageable.
Should I always award to the low bidder?
Not automatically. Compare leveled totals, then weigh schedule, capacity, past performance and insurance. The lowest bid with scope gaps may not be the lowest cost.
Is this template free?
Yes, free with no account. TrueBid Pro is $15/month and saves your bid packages.
Free tool
Bid Tabulation Template
Free tool
Subcontractor Bid Comparison Tool
Free tool
Bid Leveling Spreadsheet (Without the Formulas)
Free tool
Bid Exclusions Checklist for General Contractors
Guide
What Is Bid Leveling? A Plain-English Guide for General Contractors
Guide
Bid Leveling Template: How to Compare Subcontractor Bids Apples-to-Apples
Guide
7 Scope Gaps That Show Up in Subcontractor Bids (and How to Catch Them)